Brent
Rosecrans and Gil P. Dorcey, Agilent Technologies
Like
most fabs, the 150-mm wafer facility run by Agilent Technologies in
Fort Collins, CO, has limited toolset capacity to manufacture its
high-mix product line of CMOS and gallium arsenide products. Therefore,
each tool must be reliable and function at its rated capacity to avoid
bottlenecks that can ultimately limit the output of the entire fab.
This article describes a successful effort by Agilent personnel to
improve the performance of the fab's plasma etchers, which had been
experiencing excessive downtime as a result of faulty radio-frequency
(RF) subsystems.
RF
Subsystem Retrofit
Agilent
uses the 590 plasma etcher from Lam Research (Fremont, CA) to etch
the final nitride passivation layer. Although not a particularly demanding
process, nitride passivation etch requires that the plasma tool process
each wafer correctly. In addition, the passivation processing module
has very tight wafer output scheduling to meet customer shipments,
requiring that the tool achieve the highest uptime rates possible.
Since the nitride passivation etch step is a back-end-of-line process,
there is no way to make up for time lost because of tool downtime.
For
some time, Agilent's RF subsystems were malfunctioning: either they
were causing the plasma sporadically to not ignite or the matching
network was unable to match the plasma impedance correctly in order
to bring reflected power within the range allowed by the tool controller.
System experts spent a great deal of time running conventional tests,
performing standard fixes, and replacing parts as recommended by the
tool manufacturer, but to no avail.
Then
the fab stepped outside the box to achieve the needed results. It
turned to Advanced Energy Industries (AE; Fort Collins, CO), which
had developed a complete RF-system retrofit kit for the Lam plasma
etchers that could be installed easily and quickly without altering
fundamental tool functionality or requiring a significant tool reconfiguration.
The retrofit consisted of a fixed-component RF matching network, AE's
RFG 1251 generator designed to deliver power into a non-50-Ω
load, and AE's Z-Scan RF impedance sensor.
The
sensor is used to monitor and control RF power delivery to the cathode
of the etch chamber to guarantee repeatable, point-of-use RF power
delivery. This control is crucial, because experience has shown that
both the ability of the matching network to match the impedance of
a given process and the speed with which it attains a proper match
vary. The malfunctioning of the matching network causes variations
in the amount of power delivered to the chamber, leading to changes
in the etch rate of the nitride film. In some cases, the RF matching
was so poor that that film did not etch at all.
An
RF matching network consists of a set of capacitors and inductors
that are designed to match the impedance of the load to the source
impedance of the RF generator (in this and most cases, 50 Ω).
The load consists of the plasma chamber with plasma-ignited process
gases, the wafer, the RF cable, and RF transfer components. To match
the impedance of the process chamber to the source impedance of the
generator, the match must be configured to the conjugate of the impedance
of the plasma chamber. The conjugate of a load presents the same RF
resistance while operating at the opposite reactance. The match transforms
the phase angle of the power delivered to the matching network throughout
the plasma to 0° and sets the resistance to the generator source
impedance of 50 Ω.
The
main difference between an automatic matching network (automatch)
and a fixed matching network is that the former has sensors and a
control loop to vary the value of the series and shunt elements to
make a 50-Ω match. While a fine approach for many applications,
automatch adds complexity and variation, and it requires periodic
setup and maintenance. In contrast, the values of the shunt and series
elements in the fixed matching network are set based on process requirements.
In addition, the fixed network has no moving parts and does not require
adjustments.
When
the fixed matching network is used, the input impedance of the matching
network is allowed to vary from 50 Ω in response to process conditions.
Consequently, the RF generator must be configured so that it can deliver
power into a non-50-Ω load. In Agilent's retrofit project, a
1250-W RF generator replaced the existing 650-W generator, providing
additional capacity to deliver power into the off-axis load.
After
Agilent and AE engineers installed a Z-Scan sensor and ran the tool
through the normal processes, they concluded that the impedances and
power levels of the processes to be run were within the limits of
the fixed-match setup and that the proper shunt and series for all
processes existed.
New
System Installation and Results
When
an Agilent team installed the first RF-subsystem retrofit system on
a plasma etcher, they replaced the existing RF generator with an RFG
1251 RF generator and replaced the existing automatic matching network
with a fixed matching network that was approximately the size of a
deck of playing cards. The team also replaced the Lam phase/mag detector
and the capacitor drive motors with sheet-metal parts designed specifically
for the Lam AutoEtch match unit. A Z-Scan sensor was mounted where
the motors had been. A Z-Scan RF impedance sensor was placed after
the matching network. Overall, the quality and fit of the parts was
excellent, allowing the team to complete the fairly complex retrofit
in just four hours. The photographs in Figures 1a and 1b show the
RF matching network area in the etcher before and after the retrofit,
respectively.
 |
Figure
1: Lam etcher matching network (a) before, and (b) after the
retrofit. The matching network is contained on the circuit card
next to the Z-Scan RF sensor. |
 |
| Figure
2: Comparison between the number of equipment failures in the
first year (before the retrofit) and the number of failures in
the second year (after the retrofit). |
Since
the retrofit was driven primarily by the cost of downtime associated
with RF subsystem failures, the question of downtime was scrutinized
thoroughly. Figure 2 compares the number of failures in the first
year (before the retrofit) with the number of failures in the second
year (after the retrofit). Figure 3 shows that the time required to
resolve an RF subsystem failure and get the tool back into production
decreased markedly after the retrofit. And Figure 4 demonstrates that
cumulative RF subsystem downtime was reduced by 92%, from 80 to 6
hours, after the installation of the new RF system. Further education
in the use of the system has reduced RF subsystem downtime to nearly
zero. Since the last quarter of 2003, no catastrophic failures requiring
the replacement of parts or other system retuning have occurred.
 |
| Figure
3: Comparison between the time required to resolve an RF subsystem
failure and get the tool back into production before and after
the retrofit. |
An
unexpected benefit of the retrofit was an improvement in process stability.
Because delivered power in the new system is measured at the electrode
and instant feedback is given directly to the generator, the etch
process could be centered immediately after installation and stability
could be maintained. The charts in Figures 5a and 5b illustrate the
fab's standard process qualification monitor for etch-rate performance
six months before and six months after the installation of the new
system, respectively.
 |
| Figure
4: Comparison between cumulative RF subsystem downtime before
and after the retrofit. Downtime was reduced by 92% after the
installation of the new RF system. |
Using
the new RF delivery system, the etch-rate standard deviation was reduced
from more than 16 Å/sec to approximately 2 Å/sec. Before
the retrofit, there were 13 out-of-control events out of 52 etch tests,
compared with 0 such events out of 30 tests after the retrofit. Since
out-of-control events require the use of additional test wafers and
possible maintenance intervention, their reduction directly reduces
downtime and lowers costs.
 |
| Figure
5: Control charts showing the silicon nitride etch rate (in Å/sec)
using (a) the standard RF delivery system, and (b) the new RF
delivery system. |
Conclusion
A
fab team at Agilent found that an RF system retrofit increased equipment
uptime. In addition, improved process quality has enabled the fab
to reduce the consumption of test wafers and focus efforts on more-pressing
problems. Increased predictability of critical end-of-line processes
has allowed the team to more effectively forecast line wafer outs
without uncertainty caused by excessive downtime.
Brent
Rosecrans is an equipment engineer at Agilent Technologies'
wafer fab in Fort Collins, CO. He is responsible for the installation,
upgrades, and continuous improvement of plasma processing equipment
in the company's silicon and compound semiconductor production lines.
Before joining the company, Rosecrans worked as an equipment technician
for Symbios Logic and IBM. He received an electronics degree with
a major in computer systems from North Dakota State College of Science
in Wahpeton. (Rosecrans can be reached at 970/288-3606 or
brent_rosecrans@agilent.com.)
Gil
P. Dorcey is lead maintenance technician for Agilent Technologies'
wafer fab etch group. He is responsible for the repair and upgrade
of plasma etch process equipment on the company's silicon and compound
semiconductor production lines. Dorcey has been a maintenance technician
in myriad equipment areas at Hewlett-Packard and Agilent for 26 years.
He received an electronics degree from Palomar College in San Marcos,
CA, and has received continuing education through both Hewlett-Packard
and Agilent. (Dorcey can be reached at 970/288-6955 or gil_dorcey@agilent.com.)